Sohar Port Warehouse Complex
Back to Case StudiesWarehouse

Sohar Port Warehouse Complex

Sohar, OmanSohar Port & Freezone

15,000
m² Floor Area
180
mm Slab Thickness
30
kg/m³ Dosage
22%
Cost Saved

Overview

15,000 m² warehouse floor using SFRC instead of traditional rebar mesh.

Challenge

Tight construction schedule and requirement for high flatness (FM2) classification.

Solution

FlowSense SF-80/60 at 30 kg/m³ dosage with 180mm slab. Joint spacing at 6m centers.

Results

22% cost saving, 40% faster construction, superior crack control. Zero maintenance issues after 18 months.

The SFRC solution saved us 3 weeks on the construction schedule and reduced our floor costs significantly.

Ahmed Al-Balushi

Project Manager, Sohar Port