Real-World Results
Case Studies
Real-world SFRC projects showcasing cost savings, faster construction, and superior performance.

WarehouseFeatured
Sohar Port Warehouse Complex
Sohar, Oman
15,000 m² warehouse floor using SFRC instead of traditional rebar mesh.
15,000
m² Area
30
kg/m³
22%
Saved

ParkingFeatured
Muscat Grand Mall Parking
Muscat, Oman
Multi-level parking structure with SFRC slabs for all basement levels.
8,000
m² Area
25
kg/m³
18%
Saved

Cold Storage
Duqm Cold Storage Facility
Duqm, Oman
Temperature-controlled storage with heavy racking loads.
5,000
m² Area
35
kg/m³
25%
Saved